No. | Document Name | Quantity | Specification |
01 | The business license of company | 02 | The notarized copy within 3 months |
02 | The drawing of the house status (attached with pink book) | 02 | The copy |
03 | To provide information: name, year of birth, ID number, date of issue, place of issue of staffs in fireman team (at least 05 people) | 02 | Only provide information |
04 | A minutes of fire protection inspection (for works over 03 floors) | 02 | The notarized copy within 3 months
Note: For works over 03 floors must be constructed the work of fire prevention as: fire solution; emergency exit; the domestic fire extinguishing system; fire cistern; automatic fire system Sprinkler; automatic fire alarm system; ventilating fan, ventilating system for venting out of smoke in basement; anti-lightning system). In this case VLC will quote a specific price after surveying the actual works from the performance unit.
|
03 | VLC will complete the entire or fire protection plan, customers only need to sign and seal a stamp on the record. |
- The implementation period: 15-20 working days.
In some cases, the police can request that the enterprise must equip the portable fire extinguisher - CO2.
For works over 03 floors must be constructed the work of fire prevention as: fire solution; emergency exit; the domestic fire extinguishing system; fire cistern; automatic fire system Sprinkler; automatic fire alarm system; ventilating fan, ventilating system for venting out of smoke in basement; anti-lightning system). In this case VLC will quote a specific price after surveying the actual works from the performance unit.
VLC has services of the fire protection document in the provinces and cities, please contact VLC for a detailed quotation.
Reader Comments